- Location - Monheim (Germany)
Modular Laboratory Deployment Polaroid Monheim
- 16 Container Laboratory
- 288 m²
- Commisioned in 24 Weeks
- Fully Operational at Handover
- Factory Build
- Integration
- Validation
- Placement
- Regulatory Handover
Execution completed under fixed scope with documented validation and formal handover.
Challenge / Solution / Outcome
What This Deployment Solved
CHALLENGE
- No Available Construction Space for Laboratory Expansion
The client required additional laboratory capacity but had no available building area. Conventional construction timelines and permitting constraints made expansion infeasible within the required timeframe.
SOLUTION
- Prefabricated Modular Deployment on Existing Parking Area
The installation was executed on an upgraded parking area using point foundations. Laboratory modules were prefabricated off site, fully equipped, and delivered ready for integration.
OUTCOME
- Operational Laboratory Delivered Without Construction Delay
The facility was installed and commissioned within 24 weeks. The client achieved early operational readiness without the delays, complexity, or cost exposure of traditional construction.
Operational Readiness Achieved ~
24 Months Faster
Than Conventional Construction
What Was Delivered
Delivered Systems
Technical Backbone
- HVAC Systems
- Electrical Distribution
- Network Integration
- Utility Interfaces
Functional Workspace
- Fully Equipped Laboratory
- Layout Integrated Furniture
- Workflow Optimized Zones
Regulatory Handover
- GEG Compliant Build
- Regulatory Ready Installation
- Documentation Prepared for Handover
Our Results vs Traditional Construction
| Metric | Delivered Outcome | Traditional Construction |
|---|---|---|
| Operational Readiness | Laboratory operational at early stage | Delayed by full construction timeline |
| Capacity Increase | +85% additional laboratory capacity | Limited by space and construction constraints |
| Time to Operation | 24 weeks total deployment | Typically 2 to 3 years |
| Time Saved | ~24 months faster delivery | No time savings |
| Cost Efficiency | ~65% cost reduction | High CAPEX and cost overruns risk |
| Deployment Feasibility | Installed on existing parking area | Requires dedicated construction site |
Execution Evidence
Evidence Gallery
Each phase of the deployment was executed as a controlled process with defined timelines, factory preparation, and on site integration. This ensures predictable delivery, minimized disruption, and validated system readiness.
Formal Acceptance
Client Confirmation
Modular laboratory unit delivered to defined scope with integrated systems and complete documentation. Installation and handover were executed as agreed without delays or deviations.